Understand how the system works before deciding how to change it

Many organisational problems are difficult to understand because their causes sit across several functions, processes and relationships. We work with the people who understand these systems to build models of how they behave, so dependencies can be explored, assumptions tested and the consequences of a decision examined before anything changes.

Top-down aerial view of an electrical substation, its equipment laid out in a regular grid

Why we model the whole system

A useful model starts with a clear question rather than a complete dataset.

Read more in There Is No Such Thing as Good Data.

A new security lane, an extra crane or a faster approval step can each look like an improvement on its own. Whether it helps depends on what sits either side of it. If another stage is the constraint, money spent elsewhere improves a local measure and leaves the whole system where it was.

A model makes those relationships explicit. It sets out what flows through the system, where it waits, who controls each lever and what each one costs, so options can be compared on the same basis. It also shows where the evidence is thin, which is often as useful as the answer.

Choosing the level of detail

An organisation can be described at several levels, each of which answers different questions, and detail beyond what the question needs adds cost without adding insight.

Organisation

Where should the next five years of capital go to meet the outcomes a regulator will measure?

Holds
Assets, funding, risks and outcomes, in yearly or quarterly steps
Method
Portfolio and system dynamics models; scenarios rather than forecasts
Programme

Which stage limits capacity, and what does relieving it gain the whole system?

Holds
A chain of stages converted to one common unit, so the constraint shows
Method
Constraint and flow models
Process

Where does a design change wait between drafting, costing and approval?

Holds
Steps, hand-offs, queues and the rules that route work
Method
Process mapping; discrete-event simulation where queues matter
Activity

How much does one repeated task vary, and what drives the variation?

Holds
Durations, resources and their spread for a single task
Method
Statistical and Monte Carlo models fitted to observed cycles

Illustrative questions. Levels are linked only where a decision crosses them and the evidence supports the link; we do not assume one connected model of everything.

How we build a model

Subject specialists know how the system really behaves, including the parts that no dataset records, so they are partners in building and checking the model rather than simply sources of data.

  1. Frame the questionAgree the decision, the outcome that matters, the boundary of the system and who knows each part of it best.
  2. Describe the systemMap what flows, where it waits, which rules apply and who holds each lever. Every assumption is written down and owned.
  3. Build and testBuild the model at the right resolution, then check it against what specialists expect and what records show.
  4. Explore the optionsRun scenarios, search for better combinations and show where the result is sensitive to an uncertain input.
SimulationRunning the system forward under different conditions to see how queues, capacity and resources behave over time.
OptimisationSearching many combinations of options for those that best meet the objectives and constraints that have been agreed.
UncertaintyRanges instead of single numbers where inputs are uncertain, so a decision can be judged on how robust it is.
ValidationChecking the model against expert judgement and historical evidence, and saying plainly how far it has been validated.

Two illustrative models

Both are illustrative models, built to show the method, the structure and the kind of question a model can answer.

Airports, optimised as a system

Airspace to Kerb follows one peak hour at an illustrative two-runway hub through six stages: demand, airspace, runway, stands, terminal and surface access. Each stage is converted to passengers per hour, and the smallest is the constraint. It holds 17 stakeholders and nine preset scenarios.

In its "airport silo" scenario the airport invests in security lanes, stands and e-gates, but the runway still binds, so most of that spend adds no peak throughput. That is the point a whole-system model makes and a single-stage business case misses.

Ports, configured by demand

The port configurator starts with the customer's demand: vessel calls a week, cargo per call, dwell time and the sharpness of the peak. It links four sets of requirements, from demand through marine and landside space to capital and operating cost, and recalculates every option as an input changes.

It shows how a model can sit inside a commercial conversation: options can be tested and compared while the discussion is happening.

Other sectors where this applies

Any system in which several parts compete for the same capacity can be modelled in the same way: find the constraint first, then test the options before committing any money.

Water and reservoirsBuilding several reservoirs at once? We model the programmes together to find what drives time and cost, and where schemes compete for the same supply chain capacity, so the sequence is optimised across the portfolio rather than scheme by scheme. See the reservoir programme model.
Energy networksWhy does a grid connection take years? We model substation capacity, outage windows and the connection queue to show which change shortens the wait for the most customers.
Factories and offsite manufacturingCould your capital investment be built in modules that follow demand? We model stations, work in progress and lead times to show how much output each phase of investment buys, so the business case adds capacity as orders firm up.
Construction site logisticsDoes the project need 50 cranes? We model gates, hoists, cranes, laydown areas and delivery slots together to find what actually limits progress. Sometimes the answer is fewer cranes and a different delivery pattern.
RailHow much work fits in a possession? We model engineering access, depot and stabling capacity and station flows, so work is planned around the true limit rather than the usual one.
Hospitals and health estatesWhich repair protects the most service? We link the estate's condition to bed and theatre flow, so backlog maintenance is prioritised by its effect on patients, not by the age of the asset.

What a model can and cannot do

A model is a structured argument about how a system behaves. It is only as good as its assumptions, so we make them visible and replaceable, and we say how far each model has been checked.

  • Our models explore consequences; they do not produce certain predictions.
  • They are built for a decision rather than maintained as a live copy of the operation, so we do not describe them as real-time digital twins.
  • Where an input is uncertain, results are shown as ranges, and the inputs that matter most are named.
  • A person makes the decision, and the model informs it.

Related

Questions

Do we need clean data before we start?

No. We start with the question and the people who know the system. Records are used where they help to calibrate or check the model, and gaps are shown as gaps.

How accurate are the models?

That depends on the question and the evidence available, so we say so for each model: what it has been checked against, where it is uncertain and which inputs matter most. A model that is honest about its limits is more useful than one that looks precise.

Is this a digital twin?

No. We build models for decisions, at the level of detail those decisions need. Some can be rerun as inputs change, but we do not present them as live replicas of an operation. We do, however, build digital twins as a separate service, where an organisation needs a connected model of an asset or operation that is kept up to date.

Do we have to use your software?

No. We choose the modelling approach and tools that suit the problem. Where our own products help, we will say why; where they do not, we will not use them.

Who keeps the model at the end?

We agree that at the start. The aim is a model your team understands and can question, with its assumptions written down.

Talk to us about a decision you need to test

Tell us what you need to decide and what makes it hard. We can help work out whether a model would help, and at what level of detail.

Discuss a challenge